MONGLA PORT AUTHORITY (BANGLADESH)
Anticipated Permissible Draughts of Pussur River
(From Fairway Buoy to P.P Jetty)
JAN to JUN' 2008
|
JUL to DEC' 2008 Ref:MPA/H&C/AHM(OP.)/007(P-1)2008-121 Dated 24-06-2008 |
|
Note : 1) |
ALL INCOMING AND OUTGOING VESSELS SHOULD ARRIVE AT FAIRWAY AND HIRON POINT RESPECTIVELY ON OR BEFORE THE TIME SHOWN ABOVE.
|
|
Note : 2) |
THE PERMISSIBLE DRAUGHTS OF PORT JETTY AND OTHER PRIVATE JETTY WILL BE THE RESPECTIVE DRAUGHTS DECLARED FROM TIME TO TIME.
|
|
Note : 3) |
THE DECLARED DRAUGHTS MAY BE REDUCED OR INCREASED ACCORDING TO DEPTH AVAILABLE IN THE NEXT SURVEY.
|
|
Note : 4) |
FOR SAILING VESSEL FROM P.P. JETTY PERMISSIBLE DRAFT WILL BE 0.20 M MORE AS DECLARED ABOVE.
|
|
SD/- |
|
|
HARBOUR MASTER |