MONGLA PORT AUTHORITY (BANGLADESH)

 Anticipated Permissible Draughts of Pussur River 

(From Fairway Buoy to P.P Jetty)

 

JAN to JUN' 2008

Part -I  (PAGE-1  / PAGE-2)

Part -II  (PAGE-1  / PAGE-2)

Part -III  (PAGE-1  / PAGE-2)

 

 JUL to DEC' 2008 

Part -I  (PAGE-1  / PAGE-2)

Part -II  (PAGE-1  / PAGE-2)

Part -III  (PAGE-1  / PAGE-2)

Ref:MPA/H&C/AHM(OP.)/007(P-1)2008-121

Dated 24-06-2008

 Berth Wise Draft Chart 

 

 

Note : 1)

ALL INCOMING AND OUTGOING VESSELS SHOULD ARRIVE AT FAIRWAY AND HIRON POINT RESPECTIVELY ON OR BEFORE THE TIME SHOWN ABOVE.

 

Note : 2)

THE PERMISSIBLE DRAUGHTS OF PORT JETTY AND OTHER PRIVATE JETTY WILL BE THE RESPECTIVE DRAUGHTS DECLARED FROM TIME TO TIME.

 

Note : 3)

THE DECLARED DRAUGHTS MAY BE REDUCED OR INCREASED ACCORDING TO DEPTH AVAILABLE IN THE NEXT SURVEY.

 

Note : 4)

FOR SAILING VESSEL FROM P.P. JETTY PERMISSIBLE DRAFT WILL BE 0.20 M MORE AS DECLARED ABOVE.

 

SD/-

HARBOUR MASTER